Traffic Changes During Providence Bridge Pedal
Due to the Providence Bridge Pedal, there are a number of changes to traffic on Portland’s bridges between 5am and Noon on Sunday, Aug. 8:
Morrison Bridge - OPEN both directions. Eastbound restricted to one lane 5 a.m. to 11 a.m.
Burnside Bridge - OPEN both directions.
St. Johns Bridge - OPEN both directions. Traffic restricted to one lane in both directions 7 a.m. to noon.
Sellwood Bridge - CLOSED westbound 5 a.m. to 9 a.m. Eastbound lanes open throughout the event
Ross Island Bridge - CLOSED westbound 5 a.m. to 11 a.m. Eastbound lanes open throughout the event
Marquam Bridge - Top deck (I-5 northbound) CLOSED 5 a.m. to noon. I-5 northbound traffic will be routed to I-405. Bottom deck (I-5 southbound) open throughout the event
Hawthorne Bridge - CLOSED eastbound 6:30 a.m. to noon. (note: outside eastbound lane will close Saturday evening) Westbound lane open
Steel Bridge - CLOSED both directions 7 a.m. to noon.
Broadway Bridge - CLOSED in both directions due to construction.
Fremont Bridge - Top deck (I-405 southbound) CLOSED 5 a.m. to noon. Bottom deck (I-405 northbound) open throughout the event
Traffic information courtesy of the Providence Bridge Pedal
© 2010 OPB
Share this article
Discuss
blog comments powered by DisqusRelated articles
- House Speaker Joins Congresswoman Herrera Beutler For Fundraiser
- UW Grad Is Latest Washington-Based Soldier Killed In Afghanistan
- Police: Mother Of Abandoned Children Located


